The Gist
News and Features
Global Philippines Fine Living
Insights
INVESTMENT STRATEGY
Economy Stocks Bonds Currencies
THE BASICS
Investment Tips Explainers Retirement
Webinars
2024 Mid-Year Economi Briefing, economic growth in the Philippines
2024 Mid-Year Economic Briefing: Navigating the Easing Cycle
June 21, 2024
Investing with Love
Investing with Love: A Mother’s Guide to Putting Money to Work
May 15, 2024
retirement-ss-3
Investor Series: An Introduction to Estate Planning
September 1, 2023
View All Webinars
Downloads
economy-ss-9
Economic Updates
Quarterly Economic Growth Release: 5.4% Q12025
DOWNLOAD
investment-ss-3
Economic Updates
Policy rate views: Uncertainty stalls cuts
DOWNLOAD
grocery-2-aa
Economic Updates
Inflation Update: BSP poised for a string of rate cuts as inflation cools
DOWNLOAD
View all Reports
Metrobank.com.ph Contact Us
Follow us on our platforms.

How may we help you?

TOP SEARCHES
  • Where to put my investments
  • Reports about the pandemic and economy
  • Metrobank
  • Webinars
  • Economy
TRENDING ARTICLES
  • Investing for Beginners: Following your PATH
  • On government debt thresholds: How much is too much?
  • Philippines Stock Market Outlook for 2022
  • No Relief from Deficit Spending Yet

Login

Access Exclusive Content
Login to Wealth Manager
Visit us at metrobank.com.ph Contact Us
Access Exclusive Content Login to Wealth Manager
Search
The Gist
News and Features
Global Philippines Fine Living
Insights
INVESTMENT STRATEGY
Economy Stocks Bonds Currencies
THE BASICS
Investment Tips Explainers Retirement
Webinars
2024 Mid-Year Economi Briefing, economic growth in the Philippines
2024 Mid-Year Economic Briefing: Navigating the Easing Cycle
June 21, 2024
Investing with Love
Investing with Love: A Mother’s Guide to Putting Money to Work
May 15, 2024
retirement-ss-3
Investor Series: An Introduction to Estate Planning
September 1, 2023
View All Webinars
Downloads
economy-ss-9
Economic Updates
Quarterly Economic Growth Release: 5.4% Q12025
May 8, 2025 DOWNLOAD
investment-ss-3
Economic Updates
Policy rate views: Uncertainty stalls cuts
May 8, 2025 DOWNLOAD
grocery-2-aa
Economic Updates
Inflation Update: BSP poised for a string of rate cuts as inflation cools
May 6, 2025 DOWNLOAD
View all Reports
BusinessWorld 3 MIN READ

Energy dep’t readies large-scale renewable energy auction

March 13, 2025By BusinessWorld
Related Articles
PHL stocks drop further to track Asian, US shares December 7, 2023 September budget gap widens October 25, 2023 BSP may extend pause until yearend August 22, 2023

The Department of Energy (DoE) is set to offer a total of 10,478 megawatts (MW) of renewable energy (RE) capacity, which includes some that will be paired with battery energy storage systems (BESS), under the fourth round of the green energy auction (GEA-4) program.

The DoE is planning to auction off 3,940 MW of ground-mounted solar capacity, 48 MW of roof-mounted solar capacity, 3,000 MW of floating solar capacity, and 2,390 MW of onshore wind capacity, based on the notice of auction posted on its website.

The government will also offer integrated RE and energy storage system (IRESS) totaling 1,100 MW in solar generation capacity, along with undisclosed storage capacity.

A BESS is a type of energy storage system that uses batteries to store electrical energy from the grid and releases it when needed to augment supply or improve power quality.

The GEA program (GEAP) aims to promote RE as one of the country’s primary sources of energy through competitive selection. RE developers compete for incentivized fixed power rates by offering their lowest price for a certain capacity.

The DoE is targeting to install 7,523 MW in RE capacity in Luzon, 2,143 MW in Visayas, and 812 MW in Mindanao.

The projects resulting from the auction are scheduled to come online between 2026 and 2029. The supply contract for winning RE projects will be for 20 years, starting from the commercial operation date of the plant.

“The release of the TOR (terms of reference) for GEA-4 underscores the Philippines’ commitment to transitioning to clean energy while ensuring energy security. By ensuring a transparent and competitive selection process for renewable energy projects, we are accelerating the shift toward a more sustainable, secure, and resilient energy system,” Energy Undersecretary Rowena Cristina L. Guevara said in a statement.

The TOR sets out the technical, financial, and commercial requirements that will govern project selection, ensuring a transparent and competitive bidding process.

The DoE said that it will release updated GEAP guidelines to clarify the qualifications of eligible suppliers and ensure fair pricing mechanisms for projects under the program.

Under the new guidelines, qualified suppliers must either hold an RE service contract or possess a certificate of authority issued under the Revised Omnibus RE Guidelines.

“GEA-4 is expected to drive substantial investment in renewable energy, reinforcing its role as a key pillar of the Philippines’ energy transition,” the DoE said.

As a flagship government initiative, the program is seen to contribute to the country’s goal of achieving a 35% share in the power generation mix by 2030.

Asked to comment, Toby Allan C. Arce, head of sales trading at Globalinks Securities and Stocks, Inc., said that offering such a large capacity in a single auction “sends a clear and strong message to investors about the Philippine government’s dedication to renewable energy development.”

“This large-scale opportunity could attract both local and international investments, showcasing the RE sector as a lucrative and stable avenue for growth,” Mr. Arce said in a Viber message.

“It further positions the country as a regional leader in green energy, potentially fostering long-term partnerships and technology transfer,” he added.

Last month, the DoE announced that GEA-3 attracted 7,500 MW worth of bids, exceeding the auction goal of 4,650 MW. The auction round covered pumped-storage hydro, impounding hydro, and geothermal.

An auction round dedicated to offshore wind projects is also set to launch in the third quarter of 2025, stepping up towards the Philippines’ goal to attain offshore wind power generation by 2028. – Sheldeen Joy Talavera, Reporter

This article originally appeared on bworldonline.com

Read More Articles About:
Worldwide News Philippine News Rates & Bonds Equities Economy Investment Tips Fine Living

You are leaving Metrobank Wealth Insights

Please be aware that the external site policies may differ from our website Terms And Conditions and Privacy Policy. The next site will be opened in a new browser window or tab.

Cancel Proceed
Get in Touch

For inquiries, please call our Metrobank Contact Center at (02) 88-700-700 (domestic toll-free 1-800-1888-5775) or send an e-mail to customercare@metrobank.com.ph

Metrobank is regulated by the Bangko Sentral ng Pilipinas
Website: https://www.bsp.gov.ph

Quick Links
The Gist Webinars Wealth Manager Explainers
Markets
Currencies Rates & Bonds Equities Economy
Wealth
Investment Tips Fine Living Retirement
Portfolio Picks
Bonds Stocks
Others
Contact Us Privacy Statement Terms of Use
© 2025 Metrobank. All rights reserved.

Read this content. Log in or sign up.

​If you are an investor with us, log in first to your Metrobank Wealth Manager account. ​

If you are not yet a client, we can help you by clicking the SIGN UP button. ​

Login Sign Up